Tuesday, March 07, 2017

Phase I of parallel taxiway ready

The Airports Authority of India on Monday commissioned the Phase I of the parallel taxiway (or track) at the international airport here.

The Phase I track is 1,200 m in length. Air India, AI 680, Mangaluru-Mumbai flight, was the first to use the track. The fire engines of the airport gave a water cannon salute to the aircraft before it entered the taxiway.

With the opening of the new taxiway, the runway occupancy time and waiting time for aircraft at the apron (parking area) will be reduced considerably.
07/03/17 The Hindu
To Read the News in full at Source, Click the Headline

0 comments:

Post a Comment