Thursday, January 21, 2010

Air India’s Engineering Achieves Significant Financial Gains

Air India has assembled, tested and delivered CF6 80C2 Engine S/No: 695 296 belonging to a Customer routed through Aerostar, earning approx. USD 300,000 in December 2009. Air India had recently entered in to a strategic marketing alliance with Aerostar Asset Management, a Dubai based Company, to form “The A Team” for providing Engine repair management solutions to Operators in the Gulf and Middle East region to begin with.
Last week, the Facility notched up two more landmarks accruing a total saving of approx. USD 650,000. The first 131-9B APU S/No: 7313 {Auxiliary Power Unit (APU) for new generation B 737-800 Aircraft} was assembled in the Engine Overhaul Facility. Also the assembling and testing of a fully refurbished CFM 56-7B27 Engine (B737-800) belonging to Lessor (Air Castle) was performed successfully with excellent results.
20/01/10 Vadvert, UK
To Read the News in full at Source, Click the Headline

0 comments:

Post a Comment