Monday, November 28, 2011

Kerbs at BIA closed for canopy extension

Bangalore: Beginning November 29, the existing inner kerb and the outer kerb at the Bengaluru International Airport (BIA) will be closed for the extension of the canopy in front of the terminal building.
Answering queries from Deccan Herald on the expansion of the terminal, the Bangalore International Airport Limited (BIAL) said:?“During this time, traffic will be diverted to a temporary kerb, which is being constructed to the south of the existing kerb.”
Parking areas P4 (the 10-minute free parking) and P5 (premium parking) will be temporarily closed in phases during the construction of the temporary kerb. Appropriate signage has been installed to re-direct users to other parking areas.
To accommodate the temporary road construction work, some existing walkways have been closed. During this time, all airport users are directed to use the “central walkway” for entry or exit to the terminal building.
The new roads and the associated kerbs in front of the passenger terminal building will be commissioned shortly and the new kerbs will be connected to the terminal building through clear walkways, to which passengers will be directed by well-placed signage.
27/11/11 Deccan Herald
To Read the News in full at Source, Click the Headline

0 comments:

Post a Comment