Saturday, January 28, 2012

ILS equipment calibrated at Gannavaram Airport

Vijayawada: The Instrument Landing System installed at the Gannavaram Airport near here has been calibrated after a two-day trial and testing conducted by a team of flight inspector and ground staff on Friday.
On the second day the AAI special aircraft equipped with the analyser and ILS equipment signal tracker took off at 8 a.m. and completed its technical observations and fine tuning of the equipment within one and a half hours and flew back, according to Airport Director C. Pattabhi.
Now the ILS is ready for trial by the commercial pilots once the report of the testing and calibration data is sent to the Director General of Civil Aviation (DGCA) seeking his permission for allowing trials by the DGCA approved pilots in the commercial airlines. The feedback of the pilots would be taken for a period of one week to 10 days and the data sent to the DGCA again for seeking the final commissioning of the ILS.
Once commissioning approval is obtained all the aircraft can make use of the ILS and follow the distance norms fixed for visual sighting of the airstrip and then land depending on the weather conditions. This will help land more accurately and without hassles even in cloudy and fog conditions at this airport that is now equipped with CAT-1 ILS radio signalling systems.
28/01/12 The Hindu
To Read the News in full at Source, Click the Headline

0 comments:

Post a Comment