Kolkata/ Bhubaneswar: The swanky new domestic terminal at the Biju Patnaik airport in the city had a successful trial run on Thursday with the landing of Air India flight- AI 9604 from Port Blair carrying about 20 passengers.
“The trial run is successfully completed at the arrival terminal and the departure terminal is likely to be completed by November-end. The terminal will be inaugurated by December end,” said Sharad Kumar, director - Airports Authority of India (AAI)-Bhubaneswar.
The new terminal with a total built-up area of around 200,000 sq ft at a cost of around Rs 100 crore is centrally air-conditioned with peak hour capacity of 800 passengers.
09/11/12 Business Standard
To Read the News in full at Source, Click the Headline
“The trial run is successfully completed at the arrival terminal and the departure terminal is likely to be completed by November-end. The terminal will be inaugurated by December end,” said Sharad Kumar, director - Airports Authority of India (AAI)-Bhubaneswar.
The new terminal with a total built-up area of around 200,000 sq ft at a cost of around Rs 100 crore is centrally air-conditioned with peak hour capacity of 800 passengers.
09/11/12 Business Standard